Spring is prime time for kitchen remodeling in Chicago. The weather warms up, contractors emerge from the slower winter season, and homeowners are energized to tackle home improvement projects. But successful spring kitchen remodels don't happen by accident—they require planning that starts months earlier. Here's how to prepare now for a kitchen transformation that's completed before summer entertaining season.
Why Spring is Ideal for Chicago Kitchen Remodels
Chicago's spring season offers unique advantages for kitchen renovations:
- Moderate temperatures allow comfortable work with windows open
- Contractor availability is better than peak summer months
- Material deliveries are more reliable than winter
- Projects can finish before summer gatherings and holidays
- Spring housing market timing benefits those planning to sell
The key is starting the planning process in January or February. By the time March arrives, permits should be filed and materials ordered.
Create Your Spring Remodel Timeline
A realistic timeline prevents rushed decisions and contractor conflicts:
- January-February: Design consultation, measurements, material selection
- March: Finalize design, order cabinets, file permits if needed
- April: Cabinet delivery, demolition begins, rough work
- May: Cabinet installation, countertop templating, finishing
- June: Final details, punch list, project completion
This timeline assumes custom cabinets with 3-4 week lead time. AK Cabinet Craft's 21-day production schedule fits perfectly into spring planning—order in mid-March, install in mid-April.
.png)
Set a Realistic Budget for Chicago
Chicago kitchen remodel costs vary significantly by neighborhood and scope:
- Minor refresh (paint, hardware, backsplash): $5,000-$15,000
- Mid-range remodel (cabinets, counters, appliances): $25,000-$50,000
- Major renovation (layout changes, high-end finishes): $50,000-$100,000+
Budget 15-20% contingency for unexpected issues—especially in older Chicago homes where opening walls can reveal surprises like outdated wiring or plumbing.
Need expert advice? Call (224) 808-5100 for free consultation and measurement.
Book Contractors Early
Spring is competitive season for quality contractors in Chicago. Secure your team by February:
- Cabinet company: Book design consultation in January
- General contractor: Get on schedule by February
- Electrician and plumber: Schedule 6-8 weeks ahead
- Countertop fabricator: Book templating date when cabinets ordered
Waiting until March to start calling contractors often means delays into summer or settling for whoever is available.
Chicago-Specific Spring Considerations
Spring remodeling in Chicago comes with local factors:
Weather variables: Chicago spring weather is unpredictable. Schedule deliveries with weather contingencies—a late March snowstorm can delay material transport.
Permit timing: Chicago permit processing varies by neighborhood. Some areas require 2-4 weeks for approval. Factor this into timelines.
Condo restrictions: Many Chicago high-rises limit renovation work to specific hours and require board approval. Start this process in January for spring construction.
Old home surprises: Bungalows, greystones, and two-flats often hide issues behind walls. Budget time and money for discoveries.
Prepare Your Home for Construction
Minimize disruption with proper preparation:
- Set up temporary kitchen in basement or dining room
- Clear paths for material delivery and debris removal
- Protect adjacent rooms with plastic sheeting
- Arrange alternative cooking options (microwave, outdoor grill, nearby family)
- Plan for dust—it travels throughout the house
Most kitchen remodels take 3-6 weeks of active construction. Mental preparation is as important as physical preparation.
Material Selection Tips for Spring
Order materials with spring delivery in mind:
Cabinets: Custom cabinets require 2-4 weeks production. Factory-direct options like AK Cabinet Craft offer 21-day turnaround—ideal for spring timing.
Countertops: Natural stone and quartz require templating after cabinets are installed. Add 1-2 weeks from template to installation.
Appliances: Supply chain delays still affect some appliance brands. Order early and confirm delivery dates.
Tile and backsplash: Popular styles sell out seasonally. Order by March to ensure availability.
Avoid Common Spring Remodel Mistakes
Learn from others' planning failures:
Starting too late: Calling contractors in April means summer completion at best.
Underestimating costs: Spring material prices often increase—lock in quotes early.
Ignoring permit requirements: Unpermitted work creates problems at resale.
Choosing availability over quality: A good contractor in May beats a bad one in April.
Forgetting temporary kitchen needs: Six weeks without a sink is harder than expected.
Frequently Asked Questions
Q: When should I start planning a spring kitchen remodel?
A: Start planning in January for a spring construction start. This allows time for design decisions, contractor booking, material ordering, and permit processing. Waiting until March typically pushes projects into summer.
Q: How long does a typical Chicago kitchen remodel take?
A: Most kitchen remodels take 3-6 weeks of active construction, depending on scope. Simple cabinet replacements can complete in 1-2 weeks. Major renovations with layout changes may take 8-12 weeks.
Q: What's the best month to start kitchen construction in Chicago?
A: April is ideal—weather is warming, winter backlog has cleared, and projects can finish by June. Starting in May still works but pushes completion into summer months.
Q: How much should I budget for contingencies?
A: Budget 15-20% contingency for unexpected issues. Older Chicago homes (pre-1950) should budget closer to 20-25% due to higher likelihood of discovering outdated wiring, plumbing, or structural issues.
Q: Can I stay in my home during kitchen remodeling?
A: Yes, most homeowners stay during kitchen remodels. Set up a temporary kitchen with microwave, coffee maker, and mini-fridge. The inconvenience lasts 3-6 weeks but saves the cost of temporary housing.
Get Started
Spring kitchen remodel success starts with early planning. January and February are perfect for design consultations, material selection, and contractor booking. The earlier planning begins, the smoother the spring construction process.
AK Cabinet Craft offers free in-home consultations throughout Chicago and suburbs. Custom cabinets produced in 21 days fit perfectly into spring remodel timelines.
Schedule Your Free Consultation:
- Call: (224) 808-5100
- Visit: Lincoln Park or Bucktown showroom
- Online: akcabinetcraft.com/contacts